HansaLink

Offshore hybrid multi-purpose interconnector connecting Scotland and Germany while harnessing clean energy from an offshore wind farm in Scottish waters.

Hansalink mapNow in its early development phase, HansaLink has already secured provisional connection agreements with the Scottish grid operator SSEN Transmission and the German operator TenneT.

When operational, HansaLink will:

  • power the exchange of green electricity between Scotland and Germany
  • enhance security of supply
  • deliver substantial CO₂ savings
  • create about €1.2 billion in added value
  • support over 10,000 full‑time‑equivalent job years
  • accelerate Europe’s transition towards a flexible and sustainable energy system

background-shape
Recognition and support for HansaLink:
  • 2024 & 2026: Highlighted by the European Network of Transmission System Operators for Electricity (ENTSO-E) as an essential element of Europe’s energy transition
  • December 2025: designated a Project of Mutual Interest (PMI) by the European Commission

Meet our management team

  • Key facts and benefits
    • 900 km in length between Scotland and Germany
    • 2 GW HVDC capacity – enough to power more than 2 million homes
    • 2 GW link to offshore wind farm
    • Green, clean electricity that helps support significant CO₂ reductions
    • Significant economic gains – €1.2 billion in added value and 10,000 full‑time‑equivalent job years
  • Technology behind HansaLink
    • Offshore converter platform
      Located in GB waters, the offshore converter platform will connect to a future offshore wind farm with a capacity of up to 2 GWs. Energy will be brought into the platform via 132 kV cables from the offshore wind turbines, before it is transformed and converted from Alternating Current (AC) to 525 kV High Voltage Direct Current (HVDC). This conversion from AC to DC allows power from the wind farm to be transmitted over long distances whilst minimising the loss of electrical energy as it moves along the cables.
    • HVDC Cables
      A pair of 525 kV Direct Current (DC) cables will run under the seabed and will connect between the offshore converter platform and the onshore converter stations in Germany and Scotland. 
    • Onshore converter stations
      Both the German and British grids run on Alternating Current (AC). However, to move power efficiently over long distances underwater, it must travel as High Voltage Direct Current (HVDC).

      The converter stations use Voltage Source Converter (VSC) technology to flip the power between AC and DC. There will be one onshore converter station in Germany, and one located in Scotland and when power arrives in either Germany or Scotland as DC, the converter station converts it back to AC so it can be safely plugged into the local grid and sent to homes and businesses.
  • Timeline (indicative)

    Now in its early development phase, HansaLink has already secured provisional connection agreements with the Scottish grid operator SSEN Transmission and the German operator TenneT.

    The project is currently focused on marine and terrestrial surveys to identify the most efficient route and preparing for formal planning applications in both the UK and Germany.

    The project is expected to be commissioned by 2033-2035.

  • Sustainability
    • Enables decarbonisation at scale by facilitating the large‑scale integration of offshore wind generation between Scotland and Germany, contributing to long‑term reductions in power‑sector greenhouse‑gas emissions.
    • Reduces renewable energy curtailment through a hybrid interconnector design that allows offshore wind output to be optimally distributed across two power systems, improving the utilisation of zero‑carbon generation assets.
    • Enhances overall system efficiency, reducing reliance on carbon‑intensive balancing resources by enabling cross‑border electricity flows when offshore wind generation does not fully utilise the link.
    • Strengthens security of supply and system resilience by increasing interconnection capacity between two markets, supporting reliable electricity provision during periods of variable renewable generation.
    • Demonstrates alignment with EU climate and energy policy objectives, reflected by inclusion in ENTSO‑E’s Ten‑Year Network Development Plan and designation as a Project of Mutual Interest, confirming strategic relevance, regulatory oversight, and contribution to the coordinated European energy transition.

Frequently Asked Questions 

  • Who is responsible for developing the HansaLink project?

    The project is spearheaded by WindGrid (a subsidiary of Elia Group), working in close collaboration with the grid operators SSEN Transmission in Scotland and TenneT in Germany.

  • What is a Multi-Purpose Interconnector (MPI)?

    Unlike a standard interconnector, which uses a point-to-point high-voltage cable solely to transfer power between two countries, an MPI is a subsea cable system with a dual purpose. It functions as a cross border interconnector and as an offshore transmission link for wind farms.

    This hybrid design is efficient and cost saving, reducing the amount of infrastructure needed on the seabed and at the coastline. This results in a lower environmental impact by minimising coastal landing points and ensures the infrastructure is used more consistently throughout the year.

  • How is the HansaLink project regulated?
    HansaLink operates under new frameworks for Offshore Hybrid Assets (OHAs), such as the UK Energy Act 2023. It is also recognised as a Project of Mutual Interest (PMI) by the EU and UK.
  • What are the expected economic benefits?
    It is estimated to generate approximately €1.2 billion in gross added value and support over 10,000 full-time equivalent job years over its development and first 30 years of operation.
  • What technology is being used?
    The subsea cable will stretch approximately 850 km between Scotland and Germany. It utilises advanced 525 kV HVDC technology, which minimises energy loss over long distances.
  • How much power can the HansaLink system handle?
    HansaLink is designed with a 2 GW High-Voltage Direct Current (HVDC) capacity - enough to power over 2 million homes. The system includes an offshore multi-terminal HVDC converter station to accommodate an additional 2 GW of offshore wind generation in Scottish waters.
  • How is the direction of power flow on HansaLink decided?
    Power flow is primarily driven by market price signals and grid demand. Electricity flows from the lower-priced market to the higher-priced market, meaning that if Scotland has excess wind power, HansaLink will export that energy to Germany, and vice versa.
  • Can the power flow be overridden in an emergency?
    Yes. While market forces dictate daily flows, the system operators – the National Energy System Operator Grid (NESO) in Great Britain and TenneT in Germany - can intervene when required for system security to stabilise the network and prevent blackouts.
  • Can offshore wind farms connected to HansaLink sell to either country?
    Yes. Wind farms connected to HansaLink can ‘export’ power to whichever market offers the highest demand or most favourable price at a given time, maximising the value of renewable energy.
  • How do energy companies gain access to trade across HansaLink?
    Capacity is made available via explicit or implicit auctions managed by platforms like the Joint Allocation Office (JAO). Traders purchase capacity and move electricity between the Scottish and German markets.

This website uses cookies to provide you with an optimal browsing experience. Some cookies are strictly necessary for the operation of this website and cannot be rejected, while others are used for analytical/functional/targeting purposes and can be rejected. For more information, please consult ourCookie Policy . You can manage/change your cookie preferences at any time. If you do not manage your preferences, only the cookies which are strictly necessary will be accepted.